Auburn Planning Board continues cell tower and recycling facility reviews to September

AUBURN — July 8, 2025 — Auburn Planning Board continues two contested site plan reviews to September amid unresolved engineering concerns. The board voted unanimously Tuesday to push both a 140-foot wireless telecommunications tower proposed by New Singular Wireless at 174 Leicester Street and a recycling facility for Arbor Recycling at 47-49 Rockland Road to its September 9 meeting, after Chair Ronald E. Brooks pressed both applicant teams on missing erosion control designs, outstanding land disturbance permits, and incomplete drainage details. A motion to approve the cell tower application with conditions drew no second. The board also continued a car wash renovation review for 888 Southbridge Street LLC after Brooks noted the owner is under a cease-and-desist order for beginning work without permits. Separately, the board unanimously approved an Approval Not Required plan for 17 Arlington Street, subdividing a parcel with an existing 12-unit apartment building into eight lots meeting all dimensional requirements.

Keep reading with a 14-day free trial

Subscribe to The Auburn MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Auburn MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Worcester County News · The Barre Post · The Berlin Post · The Blackstone Post · The Bolton Post · The Boylston Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.