Auburn Planning Board Approves Hammerhead Lot, Car Wash Renovation on South Street

AUBURN — August 12, 2025 — Auburn Planning Board approves hammerhead lot permit and car wash site plan at August meeting. The board unanimously approved a special permit for applicant James Bates to create a hammerhead lot at 166 South Street, part of an 8.5-acre parcel divided into four lots where Bates's children plan to build two new homes. A separate site plan review for 888 South Street LLC — owner of the car wash at 888 Southbridge Street — was also approved unanimously, with the condition that engineer Hal Chuba correct a discrepancy in plan documents between references to 10 and 11 vacuum units; the correct count is 11 vacuums serving 10 parking spaces. The board declined to act on a 53-year-old unrecorded survey brought by a resident identified as Moren Dubo for a 15 Southbridge Street parcel, with Chair Ronald E. Brooks telling the applicant the plan needs a current engineer's stamp and advising her to consult a lawyer and surveyor before returning. A planned board reorganization vote was tabled because member Dwarakesh Nallan was absent.

Keep reading with a 14-day free trial

Subscribe to The Auburn MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Auburn MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Worcester County News · The Barre Post · The Berlin Post · The Blackstone Post · The Bolton Post · The Boylston Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.