Auburn Planning Board Approves Mathnasium Tenancy, Used-Car Dealership on Washington Street
AUBURN -- December 9, 2025, Auburn's Planning Board approved two site plan applications and a lot division at its December 9 meeting. The board cleared a site plan for Mathnasium, a math-tutoring franchise taking the rear unit of a redeveloped Sulford Street building operated by Central Mass Donut LLC, with conditions limiting instructional hours to noon to 7:30 p.m. weekdays and 10 a.m. to 2 p.m. Saturdays; the building had been under a stop-work order from the building inspector. The board also approved a used-car dealership site plan for Gabriel Morera Codino at 500 Washington Street, requiring directional striping and an acknowledgment that the town retains its South Street and Washington Street rights-of-way, a condition raised after a DPW review flagged a potential encroachment that could complicate future sidewalk construction. Three applications, Fuss and O'Neill, Todd Ostrowski with Quality Contracting, and New Singler Wireless, were each continued to the January 13, 2026 meeting.
Keep reading with a 14-day free trial
Subscribe to Auburn News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news